Oct 12, 2005 #1 jeremyk55 Civil/Environmental Joined Jun 14, 2005 Messages 56 Location US When ending an MSE wall and continuing into a fillslope, is there a maximum height that you can end that wall at? More specifically, do I need to extend the wall until it drops to some majic height before I can stop the wall and start my fill slope?
When ending an MSE wall and continuing into a fillslope, is there a maximum height that you can end that wall at? More specifically, do I need to extend the wall until it drops to some majic height before I can stop the wall and start my fill slope?
Oct 14, 2005 #2 jdonville Geotechnical Joined Sep 29, 2003 Messages 985 Location US jeremyk55, I would imagine that the wall would for practical reasons need to bee at least 1 panel height tall above the bearing pad. Jeff Jeffrey T. Donville, PE TTL Associates, Inc. http://www.ttlassoc.com Upvote 0 Downvote
jeremyk55, I would imagine that the wall would for practical reasons need to bee at least 1 panel height tall above the bearing pad. Jeff Jeffrey T. Donville, PE TTL Associates, Inc. http://www.ttlassoc.com