x5bulldog
Structural
- Jan 8, 2008
- 27
I want to avoid having a construction joint at the interface of a 4'x10'x3'deep concrete pedestal / pads on a mat foundation. Vibratory equipment is going to bear on the concrete pedestals. Can the field / construction guys easily form and pour concrete in this area to get a monolithic pour (then finish the concrete) or will I need to call-out a joint for two different pours?
I do not like the idea of creating a weaken shear plane at the joint (even though I can add reinf.for shear friction and properly embed the reinforcement into the pedestal and down into the mat). I dislike that forces from the vibratory machinery come in from all different directions / angles and having a joint at the pedestal and mat interface.
I do not like the idea of creating a weaken shear plane at the joint (even though I can add reinf.for shear friction and properly embed the reinforcement into the pedestal and down into the mat). I dislike that forces from the vibratory machinery come in from all different directions / angles and having a joint at the pedestal and mat interface.