The issues is a 2 tier stair landing whose design was engineered with a simple span W10-30 but that does not work because it was missed that both beams must be contained within their respective floor systems.
So I need to go back to the engineer (not really their error, there was no section drawing in this area and it was not obvious the lower beam could not just go straight from the plan view but I just found it creates a headroom issue).
So, my steel fabricator suggested knife plates could tie two beams together if the engineer approves, but I am curious how the bending moment gets calculated in this situation. I assume deflection will be the major issue as the floor system resists rotation and there are no point loads.