Cadi1
Civil/Environmental
- Sep 28, 2005
- 6
I am modeling stormwater runoff in a quarry and want to use the ten feet of shot rock below the floor as storage for runoff. Assuming the shot floor has a limited void space (10%) for storage,what would be the best way to model the discharge to a detention basin on the quarry floor? Also, should I model the overburden above the quarry floor as one area with a Tc to the quarry floor and the quarry floor with a Tc=0, separately?
My concern is the effect that stormwater runoff from the quarry has on downstream structures. Therefore I need to begin the routing at this basin on the quarry floor.
Any ideas would be appreciated.
My concern is the effect that stormwater runoff from the quarry has on downstream structures. Therefore I need to begin the routing at this basin on the quarry floor.
Any ideas would be appreciated.