BigEasyGeoSleuth
Geotechnical
- Dec 3, 2006
- 14
What are you geotechs using for the minimum pile spacing before group effect needs to be considered for lateral load capacity for drilled shaft groups? I have seen 6D.
For Auger Cast Pile groups? (may be less due to the auger providing lateral support??)
For Auger Cast Pile groups? (may be less due to the auger providing lateral support??)