Do any of the North American codes state the minimum amount of time that a weld should sit for before NDE is performed? I believe it is either 24 or 48 hours. Please reference the applicable code.
From AWS D1.1: Acceptance criteria for ASTM A 514, A
517, and A 709 Grade 100 and 100W steels shall be
based on NDT performed not less than 48 hours after
completion of the welds.