Is it possible to asphalt a lot from milled asphalt
(lot is currently dirt and gravel) to support intermittent propane transport deliveries(GVW 80,000 lbs)?. Lot should be somewhat permeable to rain.
If the above is feasible, the milled asphalt would be applied in relatively thin layers between each compaction,therefore,how thick should the total base be?
(lot is currently dirt and gravel) to support intermittent propane transport deliveries(GVW 80,000 lbs)?. Lot should be somewhat permeable to rain.
If the above is feasible, the milled asphalt would be applied in relatively thin layers between each compaction,therefore,how thick should the total base be?