mlevario99
Structural
- Aug 26, 2008
- 26
We have a project with piers, when the pier contractor start drilling the piers they found water, the depth of the piers are about 45 feet deep, the water in the hole is about 10' from the bottom of the hole. To dewater the hole the contractor is placing the pump hose all the way to the bottom of the pier and start pumping the concrete, once the concrete lifted the water to about 10 feet below the top of the pier they start pumping the water out. The specs allow dewatering the hole by this method, is this a good way to do it, or which method is reccomended.
Thanks
Thanks