SperlingPE
Structural
I work in a full service firm (Struct, Arch, Mech, Elec). The mechanical dept is reviewing their specs for attaching units (of all types) to the structure. ASCE 7, NFPA, and other codes have been reviewed as they pertain to seismic and wind loads.
How do other firms handle this issue?
Does the mechanical engineer include language in spec asking for the connection to the structure to be by the supplier and to include calcs?
Does the mechanical just ask for the connection by the supplier and no calcs or submittal?
Is it handled by a note on the drawings?
The structural drawings make reference to the required seismic and wind loads. The support framing is designed by structural.
How do other firms handle this issue?
Does the mechanical engineer include language in spec asking for the connection to the structure to be by the supplier and to include calcs?
Does the mechanical just ask for the connection by the supplier and no calcs or submittal?
Is it handled by a note on the drawings?
The structural drawings make reference to the required seismic and wind loads. The support framing is designed by structural.