sk10009
Materials
- Mar 15, 2006
- 55
hi guys
If carbon steel Pipe(EFW)would be required PWHT after Welding.
When would be tested mechanical test(T.S, Y.S, E.L, Hardness)
Thickness of Carbon steel pipe is 12.7mm with longitudinal welding seam.
Is it no problem that if mechanical test would be tested before PWHT.
thank
If carbon steel Pipe(EFW)would be required PWHT after Welding.
When would be tested mechanical test(T.S, Y.S, E.L, Hardness)
Thickness of Carbon steel pipe is 12.7mm with longitudinal welding seam.
Is it no problem that if mechanical test would be tested before PWHT.
thank