Once20036

Structural
Joined
Oct 7, 2008
Messages
533
Location
US
Where is that requirement in the code? For example 1 to 6 slope. Thank you.
 
I don't think it's in the code. Looks in the PtI post tensioning manual if you are in the US.
 
You can also look at
pci journal JR 303
Behavior and Design of Post-Tensioned Girder Anchorage Zones
William C. Stone, John E. Breen
p. 36 and following. (Multistrand Side Face Failure Mechanism)

I am trying to find an electronic view of this.
 
PTI manual gives some direction. They give 1:6 slope or 10m radius if I remember right. I called VSL with a similar question and they thought the 10m radius was fine
 