Does anyone have a mass concrete spread sheet they would like to share? I have several mass concrete pours to make in the comming months, and would like to go through a few calculations to determine what R value, for insulation blankets, is needed to help control the specified temperature differential, of 35 degrees F. I have used the Schmidt method of determining crack potential, and have determined that there is no real threat of cracking, however the owner, a state DOT, has rejected the calculations, and refused to allow any deviation from the specification requirements. Any help is appreciated...