Some Building Codes require f'm checked periodically. Does that mean having mortar checked by testing lab doing cube samples, or is it just observing mortar being mixed, from bags labeled correctly as to Type (M, N, S, etc) and CMU being placed?
I am specifically referring to NYC BC Chapter 17, Table 1704.3 (Level 2), and for that matter whatever the IBC 2015 also says for New York State work.
Of course its always a good idea to use labs to check mortar samples, but my question is specific to BC requirements.
I am specifically referring to NYC BC Chapter 17, Table 1704.3 (Level 2), and for that matter whatever the IBC 2015 also says for New York State work.
Of course its always a good idea to use labs to check mortar samples, but my question is specific to BC requirements.