It's the way, it works in an operating plant. If something gets blown off, the maintenance to fix it ASAP. Operation Manager is the King of the plant and you wont too much of investigation data from them. This is the regular modus operendi- temporarily fix it, run it until next major plant turnaround.
The Maintenance Manager can set up a Root Cause Analysis which will take months to conclude the findings.
If you sit on the Maintenance or Engineering side, listen to the King. If you want to go against the management plan, you will be the bad actor.
I have by this interactive forum, you have gained good knowledge of what may go wrong.