JStructsteel
Structural
- Aug 22, 2002
- 1,467
All, whats your detail for LVL framing onto Pipe column? Column cap with some lag bolts up from bottom, or saddle with thru bolts? The joists sit on top of the beams. I'm leaning towards the saddle for beam stability, or add a diagonal brace. Thoughts?