radug
Electrical
- May 23, 2007
- 105
Hello,
In large plants we usually design the LV neutral grounding as TN-S, but do not distribute the "protection cable" with the phases and neutral cables to some loads. We do join does loads through a cable that we extract from the ground mesh.
I was wondering if in IEC standards, there is any "must have" for the distribution of the "protection cable".
Thanks.
In large plants we usually design the LV neutral grounding as TN-S, but do not distribute the "protection cable" with the phases and neutral cables to some loads. We do join does loads through a cable that we extract from the ground mesh.
I was wondering if in IEC standards, there is any "must have" for the distribution of the "protection cable".
Thanks.