If giving the choice of 2" WN and LWN to any vessel vendor, I can say more than 80% of vendors will use WN, not LWN. They don't care one extra weld. Check any of your past project when LWN is not mandatory, you will find out most of the time, WN is used.
Only in two conditions we make LWN mandatory: (1) thermowell nozzle (2), client request.
Otherwise, we let vendor do what they like, and we ask (2) bracings for each nozzle for extra strength to prevent distortion for all kinds of situation.
If you have extra length of nozzle projection, especially at top head, WN will be easier to achieve. When LWN is mandatory, we will ask vendor to buy several LWNs, cut off flange and butt weld together to achieve the projection.