kgmjeric
Aerospace
- Feb 23, 2011
- 2
The structure is 35 x 45 3 sided with one 45ft open wall. the corners will have 18-24in post and the walls will be stacked logs. the ground is made up of mostly rock. everything i have read so far says that i need the first row of logs 12-24in above grade. I was planning previously planning on concrete piers with rebar holding the first row of logs down. the location is ne oklahoma frost line is very shallow.
My personal experience is in metal finishing and mechanical design. I dont have industrial experience for rules of thumb in the building industry and need some help.
How do i go about determining the number of piers and spacing for this type of structure.