If it is used for synchronizing or aurora protection, it will be critical to coordinate the phase change with the relaying folks.
In my region, the B phase transmission voltage is about 1% higher than A and C phases, so switching phases with the PT may have a slight impact on voltage control and on state estimator solutions.