blacklabs
Mechanical
- Mar 17, 2005
- 34
I have to come up with a bunch of data for the System Operator. We've managed to pull most of the data together except for the "Line Charging Susceptance" of an underground cable. I'm not an Electrical Engineer so any help on how I can come up with this will be greatly appreciated. I've checked all existing documents on site to no avail.