I'm making a light-gage steel truss out of stud shapes. I'm getting that I need to brace both the top and bottom flange of my compression chords. My top chord top flange of course is braced by my roof decking and I don't have a ceiling to brace the bottom flange of my bottom chord. Is this typically done using a block and strap method (like the bracing of studwalls) or X-bracing between the 24" o.c. trusses like I typically see between purlins on PEMB's?
Thanks.