vato
Structural
- Aug 10, 2007
- 133
The architect wants trusses supporting purlins and metal roofing which gives me nothing for diaphragm strength. The building is 80x30 with shear walls on each end. I need 500plf on the ends of the "diaphragm". I have been looking at bracing with angles, but I end up needing them across the entire roof, which actually seems reasonable. This seems like very typical construction for metal building with moment frames, but I don't like it in this application. I don't really have a ceiling diaphragm option. Any advice on an efficient bracing pattern or should I switch to the steel deck and ditch the purlins altogether?