SKJ25POL
Structural
- Mar 4, 2011
- 358
Can anybody tell me when do we do the lead abatement?
If the part in is outdoor do we still need the lead abatment?
What is the number that defines if the paint contains this much then it is required?
We have a box truss build 1955 we like to take out a rail that part of length is bolted and part of the length is rived.
Any basic and simple language info will be appreciated
Thank you
If the part in is outdoor do we still need the lead abatment?
What is the number that defines if the paint contains this much then it is required?
We have a box truss build 1955 we like to take out a rail that part of length is bolted and part of the length is rived.
Any basic and simple language info will be appreciated
Thank you