The question is that in a combined cycle power plant unit with a 2GT x 2HRSG x 1ST configuration which its gas turbine capacity is 160 MW, what lay down area is required?
- What parameters are important and effective in determination of lay down area?
- If the number of units with the above mentioned configuration reaches to 2 or 3 units, does the lay down area increase exactly to 2 or 3 times the first area?
- If the gas turbine capacity gets to 250 MW with the first configuration mentioned above, what is its impact on the lay down area?
- What parameters are important and effective in determination of lay down area?
- If the number of units with the above mentioned configuration reaches to 2 or 3 units, does the lay down area increase exactly to 2 or 3 times the first area?
- If the gas turbine capacity gets to 250 MW with the first configuration mentioned above, what is its impact on the lay down area?