ozziz
Structural
- Jul 20, 2005
- 46
Appreciate views,information and opinions on immature concrete subject to lateral loads.
The contractor has to install steel tubular piles for construction of wharf into rock sockets. The concrete specfied is 40 MPa at 28 days strength. The contract calls for the piles to be temporary braced. But the contractor wanted to release the braces after 7 days when the strength is around 25 MPa. This means the concrete is immature and has not reached its 95 % full strength. Question is will the concrete pemanently deformed if the lateral loads such as wave, current is excessive? Where can I source inform on strength of immature concrete?
The contractor has to install steel tubular piles for construction of wharf into rock sockets. The concrete specfied is 40 MPa at 28 days strength. The contract calls for the piles to be temporary braced. But the contractor wanted to release the braces after 7 days when the strength is around 25 MPa. This means the concrete is immature and has not reached its 95 % full strength. Question is will the concrete pemanently deformed if the lateral loads such as wave, current is excessive? Where can I source inform on strength of immature concrete?