Hello everyone!
Perhaps you can give some advice. So I have this storage building with very large live floor load (design load is 75 kN/m²) and the floor is about 1,15 m higher than the outside of the building. The socle is made of insulated RC sandwich panels. Because of the height difference, the horizontal pressure to the socle from this live load is massive, roughly half of the vertical value when considering it as at-rest pressure and about 30% when considering it as active pressure (which is still a lot).
I can design the socle sandwich panels as ribbed plates to take this massive load but then the columns that are connected to the socle take these huge reactions of this beam and it makes the columns and pad foundations absurd (think a moment of around 350 kNm and horizontal load of ~350 kN to a pad foundation). So the idea is to support the floor plate with the socle beam so it would take some of the vertical live load from the floor. And finally to my main question - from how large area should I take this vertical load and apply it to the socle beam vertically? Below is a sketch of the situation. There is a floor joint at a distance of about 8,8 m from the socle. I'm thinking that considering this 8,8 m as a span for a floor slab is a bit too much.
Perhaps you can give some advice. So I have this storage building with very large live floor load (design load is 75 kN/m²) and the floor is about 1,15 m higher than the outside of the building. The socle is made of insulated RC sandwich panels. Because of the height difference, the horizontal pressure to the socle from this live load is massive, roughly half of the vertical value when considering it as at-rest pressure and about 30% when considering it as active pressure (which is still a lot).
I can design the socle sandwich panels as ribbed plates to take this massive load but then the columns that are connected to the socle take these huge reactions of this beam and it makes the columns and pad foundations absurd (think a moment of around 350 kNm and horizontal load of ~350 kN to a pad foundation). So the idea is to support the floor plate with the socle beam so it would take some of the vertical live load from the floor. And finally to my main question - from how large area should I take this vertical load and apply it to the socle beam vertically? Below is a sketch of the situation. There is a floor joint at a distance of about 8,8 m from the socle. I'm thinking that considering this 8,8 m as a span for a floor slab is a bit too much.