Inverted-tee cap construction

Status
Not open for further replies.

broekie

Structural
Feb 17, 2004
150
Has anyone out there been involved in the construction of inverted-tee bridge pier caps? Our firm is working on a job with inverted-tee pier caps and the contractor wants to pour the cap in 2 pieces - one piece being the "ledge" and the other being the "stem".

We are really hesitant to have a horizontal construction joint in our pier cap, but are wondering what experiences others have had in this regard.

Thanks.
 
Replies continue below

Recommended for you

I think the horizontal joint at that location is a bad idea. Sounds like you do too.

Check out TxDOT as they do a lot of inverted tee constuction.



Regards,
Qshake
[pipe]
Eng-Tips Forums:Real Solutions for Real Problems Really Quick.
 
Thanks for the response, Qshake. I have some emails in to TxDOT employees that I know.
 