Please educate me:
The system is something like this:
network---xfmr---bus---generator
|
other loads
If there is a 3ph short circuit in the bus, should I need to cordinate de generator device 50? Isn't the best thing to trip the generator as soon as possible, no matter what happens with upsteram relays?
That's why I asked for an used value, regardless of coordination.
thanks everybody!