engABZ
Civil/Environmental
- Jul 14, 2010
- 9
Hello,
I have some points that I want to verify regarding the initial tension of a cable.
Consider a cable (pinned support at both ends) and want to have as minimum sag as possible.
1) Is that process (cable initial tension) similar to Precast slab Pre-tensioning?
So the cable will have 'built in' tension that will cancel part of the tension that will develop due to applied loads?
(In my case I'm having a udl acting on the cable Parallel to earth).
2) If I'm limited to use Max. strand size of (9/16)inch 1x19 strand. And I am allowed to let the cable have tension due to applied loads close to its breaking strength. How could I determine the initial tension?
I have read about that (initial tension) in (USS Wire Rope Engineering Handbook) but still not certain.
3) Would that Pretension have any effect on the supporting columns?
4) The pretension of the cable, does it have some technical limitations? and how about the cost?
Thanks in advance
I have some points that I want to verify regarding the initial tension of a cable.
Consider a cable (pinned support at both ends) and want to have as minimum sag as possible.
1) Is that process (cable initial tension) similar to Precast slab Pre-tensioning?
So the cable will have 'built in' tension that will cancel part of the tension that will develop due to applied loads?
(In my case I'm having a udl acting on the cable Parallel to earth).
2) If I'm limited to use Max. strand size of (9/16)inch 1x19 strand. And I am allowed to let the cable have tension due to applied loads close to its breaking strength. How could I determine the initial tension?
I have read about that (initial tension) in (USS Wire Rope Engineering Handbook) but still not certain.
3) Would that Pretension have any effect on the supporting columns?
4) The pretension of the cable, does it have some technical limitations? and how about the cost?
Thanks in advance