Chellis is recommended plates be welded 8-10' from pile tip to increase bearing in sands. Why not just weld a plate across the tip? Are the upper plates desired over the tip plate so the pile will drive straight? I have a problem in which design engineer estimated pile length at about 40' in clayey sand; we drove 65 and 100' and still do not have required capacity. We are not waiting 10 days to restrike. However, I would like to shorten length of piles in adjacent foundation and had thought of plate at tip.
Thanks,
Dirtdobber