timm33333
Electrical
- Apr 14, 2012
- 198
I need to perform lightning design based on IEC 62305. The part-2 of this standard is risk assessment which is very complicated calculations. I don’t want detailed calculations. Is there a short way to perform approximate risk assessment calculations? If I know the number of lightning flashes per year, and the dimensions and height of the structure; then can I perform some approximate quick calculations for lightning risk assessment?