LeonhardEuler
Structural
- Jun 19, 2017
- 200
I have two questions.
1) Can I specify a 1/4" PJP flare weld for a tubular butt connection if the tubes are 3/8" thickness.
2) If an aluminum connection is a CJP groove weld does the weld need to be checked if the member passes code checks? Main question here is are aluminum fillers weaker than aluminum shapes.
Thanks
1) Can I specify a 1/4" PJP flare weld for a tubular butt connection if the tubes are 3/8" thickness.
2) If an aluminum connection is a CJP groove weld does the weld need to be checked if the member passes code checks? Main question here is are aluminum fillers weaker than aluminum shapes.
Thanks