Please see the attached two sketches. Half the building framing is plywood over light gage trusses and the rest of the half is metal deck on bar joists. I have enough lengths of cmu walls on both ends to get masonry shear walls to work for lateral loads. But the problem is the connection between the plywood and metal deck. I really don't want to use a steel moment frame in the middle and would like to keep the steel frame along the middle as gravity only.
So the question is, can the two types of roof diaphragms be connected in a way that they act as continuous piece from shear wall to shear wall?