hi,
this is my first participation to the Eng-Tips Forum, so pleas grant me the privilege of the mistake
.
I'm a new-born engineer with a littel more than a two-months expirence in my first job as a road project studies engineer.
my firm has a project that requires a prevision of the budjet that erosion wates treatment should require for somthing like ten to fifteen years ahead.
the area of the project is known as muddy and with very frequent slope stability problems.
my question is : "is there any way, precise enough to build an estimation (price) out of it, to know how much erosion wastes the road will be receving per a year for a given periode?"
this was my best shot in being clear without your assistance! pleas ask quastions so I can help you help me
.
thank you for your understunding.
tell me!
this is my first participation to the Eng-Tips Forum, so pleas grant me the privilege of the mistake
I'm a new-born engineer with a littel more than a two-months expirence in my first job as a road project studies engineer.
my firm has a project that requires a prevision of the budjet that erosion wates treatment should require for somthing like ten to fifteen years ahead.
the area of the project is known as muddy and with very frequent slope stability problems.
my question is : "is there any way, precise enough to build an estimation (price) out of it, to know how much erosion wastes the road will be receving per a year for a given periode?"
this was my best shot in being clear without your assistance! pleas ask quastions so I can help you help me
thank you for your understunding.
tell me!