That's a very broad question. So don't know if anyone can give you the answer you need.
For basics you need to look at flow rates and type of contaminant and type of treatment.
Rates and contaminant will be dictated by upstream waste producers.
You can talk to a group like Novozyme about "bug" options. They may be able to assist with design issues.