mns15451
Electrical
- Mar 23, 2010
- 15
If number of gas-turbine generating units having same capacity but set to different speed droop setting i.e. 4% and 5% are running and connected to large system. Upon sudden demand of load (due to the tripping of larger unit on the system) how the load will be picked up on these units keeping in view the droop setting. What I mean is which of the two machines i.e. 4% or 5% droop will p.u more load and why?