Hello all
we are constructing a 48" crude oil line in accordance with ASME B313. we'll take a branch from existing line by a hot tap operation.
How can I find an information about at what temperatures does the impact have to be carried.
thank you all.
we are constructing a 48" crude oil line in accordance with ASME B313. we'll take a branch from existing line by a hot tap operation.
How can I find an information about at what temperatures does the impact have to be carried.
thank you all.