Hello All,
A new hot issue got thrown on the plate, having a tough start on how to tackle and would appreciate any help. I’m trying to calculate if the existing installation of a ‘surge header’ at a gas plant would handle a total plant upset condition – meaning if every valve lifted simultaneously.
Currently there’s 36 relief/safety valves piped to the surge header, which vents Methane, Ethane, & Propane to the stack. I have the design mass flow rates for each relief valve and of course could calculate the total volume of the piping, but not sure I’m on the right track.
Thanks
A new hot issue got thrown on the plate, having a tough start on how to tackle and would appreciate any help. I’m trying to calculate if the existing installation of a ‘surge header’ at a gas plant would handle a total plant upset condition – meaning if every valve lifted simultaneously.
Currently there’s 36 relief/safety valves piped to the surge header, which vents Methane, Ethane, & Propane to the stack. I have the design mass flow rates for each relief valve and of course could calculate the total volume of the piping, but not sure I’m on the right track.
Thanks