kleo
Geotechnical
- Feb 29, 2004
- 25
I am designing single bar tension reinforcement for piles - the tension center bar is GR75, non-threaded. I was planning on using terminators to develop the bar but they are limited to GR60 bars. If the bars were threaded I would use a plate and nut system; the bars are already on site so I have to use the non-threaded bars. ACI 318-08, Section 12.6 states that anchors may not be used for bar fy > 60 ksi. Any thoughts on other options?
Piles are 14 inch diameter w/ 6#6 cage bars that extend 18" into the cap, which is 3 ft. thick.
Thanks-
Piles are 14 inch diameter w/ 6#6 cage bars that extend 18" into the cap, which is 3 ft. thick.
Thanks-