goulaigan
Civil/Environmental
- May 30, 2007
- 2
Most utilities control the hazard of potential electrical current on conductive water services by installing temporary jumpers around the water service before the service is severed or replaced. What about the potential electrical current on the water-main? Is there a best practice to bond a conductive (cast or duct tile) water main before it is cut out?