A gym in a school should be piped from the first floor zone and not the 2nd floor sprinkler zone.
I know this is how it's done, i've looked through 13 but can't find it, i know it's there... i've read the line before. I'm about to throw 13 out the window.
This clause says something about the sprinklers should be piped off of the floor it serves and the ceiling height shouldn't be considered.
Is it building code or NFPA... can someone help me out before i do something irrational and get put on santas naughty list so close to x-mas.
Merry Christmas.
A gym in a school should be piped from the first floor zone and not the 2nd floor sprinkler zone.
I know this is how it's done, i've looked through 13 but can't find it, i know it's there... i've read the line before. I'm about to throw 13 out the window.
This clause says something about the sprinklers should be piped off of the floor it serves and the ceiling height shouldn't be considered.
Is it building code or NFPA... can someone help me out before i do something irrational and get put on santas naughty list so close to x-mas.