mvsubstation
Electrical
- Aug 5, 2003
- 34
Would there be an issue with installing a new zig zag grounding transformer at an existing building 480/277 3 phase, 4 wire service? In order to obtain effectively grounded solar inverter to meet utility requirement, they are requiring a grounding transformer. It seems that having a connection to ground at two different locations (the existing building ground, and the new ground connection for the zig zag), could cause unbalanced neutral current to flow between the two points and cause some ground fault devices not to operate properly among other issues.