We have an 18" x 24" grade beam that's supposed to be continuous with 3 - 5" T&B on top of 18" piles spaced 10' apart. Because it's a hillside with an existing house above us we have an elevation difference of 12-16" at pile locations where the grade beams meet. How can we make that continuous?
Maybe this sounds dumb and I'm hoping it makes sense, but I'm thinking we lap the bottom of one beam to the top of the other, and a Z bar lapping the top of the higher beam to the bottom of the lower.
Maybe this sounds dumb and I'm hoping it makes sense, but I'm thinking we lap the bottom of one beam to the top of the other, and a Z bar lapping the top of the higher beam to the bottom of the lower.