Rodmcm
Electrical
- May 11, 2004
- 260
We have an 11.5kV 58MW generator with the usual capability curve showing 0.8 lag/0.9 lead at MCR. The stator voltage limits are given as 11kV +/- 5%.
We cannot deliver/absorb full VArs at 11.5kV, we always have to change the voltage up to +/-6% across the Var range. The connection to the 132kV grid is by a tap changing transformer which we have to manually control. We would of thought that we could leave the transformer in autotap at 11.5kV and deliver the full range of VArs at 58MW. Is this common, and why?
We cannot deliver/absorb full VArs at 11.5kV, we always have to change the voltage up to +/-6% across the Var range. The connection to the 132kV grid is by a tap changing transformer which we have to manually control. We would of thought that we could leave the transformer in autotap at 11.5kV and deliver the full range of VArs at 58MW. Is this common, and why?