I had a test report from testing company, which show lower strength of cylinder at seven days and more than specified strength at 28 days. The reason specified by testing company for lower strength at 7 days was frozen cylinder during initial curing. Is it possible for concrete to gain strength at 28 days if it frozen during initial curing?
I also checked actual concrete at poured location, there was no signs of frost on the surface.