OP, have you designed the reinforcement in the column that will transfer the forces to the footing? If so, then you know how to determine the required dowel area! Make sure to take care in detailing that connection, looking for details such as maximum steel in the column and development. Assuming your firm has typical details for footings, review those and that should give you a hint for what this would look like.