GBinns
Chemical
- Mar 19, 2003
- 11
I want to flush one hydrocarbon product out of a line with another hydrocarbon product. I need to calculate how much of the second fluid is required to flush out the first fluid down to 0.01 vol% (amount of first fluid left in the pipe) in a 26" line (4 miles long).
I have found the "power velocity distribution law" equation. Has anybody had any experience using this in this type of application? Does anybody have any suggestions for solving this type of problem?
Thanks.
I have found the "power velocity distribution law" equation. Has anybody had any experience using this in this type of application? Does anybody have any suggestions for solving this type of problem?
Thanks.