sdynamic
Civil/Environmental
- Apr 28, 2005
- 10
The minimum velocity of 2 fps - 3 fps shall be maintained as a self-cleaning velocity for storm drainage system.
In a County, the design criteria for flow velocity is 2 fts and 3 fps for full and half-full flow conditions, respectively.
Does this mean that we can assume full pipes with free outfall, e.g., Full Free Flow Velocity?
Most of the design cases, the actual flow velocity is much less than the above due to the HGLs of the exiting storm drainage system connected.
Is it OK to just assume full pipes with free outfall for the minimum velocity? Or the real velocity in the systems should be considered? I am confused.
Any information or advice would be highly appreciated!
In a County, the design criteria for flow velocity is 2 fts and 3 fps for full and half-full flow conditions, respectively.
Does this mean that we can assume full pipes with free outfall, e.g., Full Free Flow Velocity?
Most of the design cases, the actual flow velocity is much less than the above due to the HGLs of the exiting storm drainage system connected.
Is it OK to just assume full pipes with free outfall for the minimum velocity? Or the real velocity in the systems should be considered? I am confused.
Any information or advice would be highly appreciated!