So structural engineer is being an ass and keeping his slab at 350mm, therefore I have no choice but to install my floor drain inside the concrete slab (due to local code floor drain neck can't exceed 500mm and due to slab being 350mm by the time this is installed below the slab i would of exceeded 500mm allowance)
Does anyone know of any manufacturers that provide this ?
so far I have only found these guys: but they are in Malaysia
Does anyone know of any manufacturers that provide this ?
so far I have only found these guys: but they are in Malaysia