DSAsteve
Structural
- Dec 26, 2004
- 15
The Elec. contractor wants to place his (2 per classroom) die cast alloy floor boxes upon home made galvanized metal strap 'chairs' attached to the subsoil w/spikes.
This blows the concept of avoiding a path for electrolysis or corrosion.
AOR says its 'means and methods'.
I think it wrong.
Your opinions please.
(I am also posting this in the Structural Forum)
Thanks, Steve (IOR)